Deuterium Handling System

1 09 2009

Got the last bits of plumbing today:

IMG_4019

Took about half hour to install:

IMG_4020

And with that the first iteration out Fusor is complete. The bubble detectors are purchased and set to ship ASAP. When they arrive we can attempt first fusion. In the meantime I’ll test out the new gas system with air.


Actions

Information

3 responses

3 09 2009
FAMULUS

The bubble detector has shipped.

5 09 2009
WTF « Prometheus Fusion Perfection

[…] Prometheus Fusion Perfection Building an Open Source Bussard Reactor « Deuterium Handling System […]

27 09 2009
Mass Flow Controller « Prometheus Fusion Perfection

[…] for the reactor. Currently we have a manually controlled needle valve to regulate flow on the deuterium handling system. I want to replace this with a computer controlled mass flow […]

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s




%d bloggers like this: